Search
  • cllrshughes

“Base Station” for LED's installed in Sidgard Road

Some great news on the Environment front with the Base Station for controlling the LED's now installed in Sidgard Road Fortescue all waiting now is for Telensa (the Content Management System supplier) to confirm the lighting points that will be within the CMS signal, once we have this in place we can start to map the varying LED replacements. Therefore the remainder of the Sidmouth conversion can commence as soon as County Council Street Lighting are confident of the signal coverage.


10 views0 comments

Recent Posts

See All

Sidford Residents Parking Consultation

Following several representations from local residents I can now confirm that the request for an Sidford Residents Parking informal consultation is going ahead. The details of the consultation are as

Footway Slurry Seal Process

Slurry Seal is the application of a sealing coat to prolong the life of the existing materials. We use this process on surfaces which are still structurally sound but showing signs of deterioration.